Drone Survey for Design Review & Supervision of Central Asia Regional Economic Cooperation Corridor Development Investment Program (CAREC) Project (221.95km)
Client: Asian Development Bank
Method: Photogrammetry
Deliverables: Preparation of Digital Elevation Model (DEM) and Digital Surface Model (DSM) , Preparation of topographic survey plans with 10 centimetre contour interval featuring bridges, drainage structures, intersections, buildings, and vegetation
Project Completion:
Field Work: 5 days
Data Processing: 5 days
Drone Survey for Design of Road at Kafir Kot
Client: Pakhtunkhwa Highway Authority
Method: Photogrammetry + LiDAR Scanning
Deliverables: Preparation of Digital Elevation Model (DEM) and Digital Surface Model (DSM) , Preparation of topographic survey plans with 10 centimetre contour interval featuring bridges, drainage structures, intersections, buildings, and vegetation
Project Completion:
Field Work: 1 days
Data Processing: 2 days
Challenges: Hilly Terrain
Drone Survey for Science & Technology Museum
Client: Dr. Qaisar Ali Associates
Method: LiDAR Scanning
Deliverables: Preparation of Digital Elevation Model (DEM) and Digital Surface Model (DSM) , Preparation of topographic survey plans
Project Completion:
Field Work: 1 days
Data Processing: 1 days
Challenges: Dense Vegetation
Drone Survey for 3D Modelling of Takht Bhai and Jamal Garhi Ruins
Client: Khyber Pakhtunkhwa Integrated Tourism Development Project – KITE
Method: Photogrammetry
Deliverables: 3D Modal for VR and Orthomosaic
Project Completion:
Field Work: 1 days
Data Processing: 2 days
Challenges: Hilly Terrain
Drone Survey for the Slope Stability analysis in Kaghan, Pakistan
Client: Khyber Pakhtunkhwa Integrated Tourism Development Project – KITE
Method: Photogrammetry
Deliverables: Point cloud data
Project Completion:
Field Work: 1 days
Data Processing: 1 days
Challenges: Hilly Terrain
Drone Survey of Iron Ore in Baluchistan for the Geophysical analysis
Client: Military College of Engineering Risalpur
Method: Photogrammetry
Deliverables: Digital Elevation Model, Point Cloud data
Project Completion:
Field Work: 1 days
Data Processing: 1 days
Challenges: Hilly Terrain
Drone Survey of flood affected areas of Swat
Client: National Institute of Urban Infrastructure Planning (NIUIP)
Method: Photogrammetry
Deliverables: Digital Elevation Model, Contours, Point Cloud data and Orthomosaic
Project Completion:
Field Work: 3 days
Data Processing: 2 days
Challenges: Hilly Terrain
Drone Survey of River Kabul for the analysis of flood
Client: Provisional disaster management Authority (PDMA)
Method: LiDAR Scanning
Deliverables: 3D Model, Flood Analysis Data, Orthomosaic and Point cloud data.
Project Completion:
Field Work: 1 days
Data Processing: 5 days
Challenges: River
400M USD project
Structural Retrofitting of Existing Bridges
Performing Non-Destructive testing on Superstructures of 12 Bridges, Pre-stressed and simply-supported. creating structural models in SAP2000
8 Storey double basement Structural and Architectural services, including geotechnical studies
Drone Survey of flood affected areas of Swat
Client: National Institute of Urban Infrastructure Planning (NIUIP)
Method: Photogrammetry
Deliverables: Digital Elevation Model, Contours, Point Cloud data and Orthomosaic
Project Completion:
Field Work: 3 days
Data Processing: 2 days
Challenges: Hilly Terrain
Integration of 19 BIM models, created in Revit to ArcGIS for a Red Sea Global Project
Design of Amusement Parts, design of Associated Steel structures, Geotechnical studies, Drone based Mapping
Geotechnical and Drone Services on Need Bases across KPK