Projects

Recently Completed Drone Based Projects

Asian Development Bank

Drone Survey for Design Review & Supervision of Central Asia Regional Economic Cooperation Corridor Development Investment Program (CAREC) Project (221.95km)

Client:  Asian Development Bank

Method: Photogrammetry

Deliverables: Preparation of Digital Elevation Model (DEM) and Digital Surface Model (DSM) , Preparation of topographic survey plans with 10 centimetre contour interval featuring bridges, drainage structures, intersections, buildings, and vegetation

Project Completion: 

Field Work: 5 days

Data Processing: 5 days

Pakhtunkhwa Highway Authority

Drone Survey for Design of Road at Kafir Kot

Client:  Pakhtunkhwa Highway Authority

Method: Photogrammetry + LiDAR Scanning

Deliverables: Preparation of Digital Elevation Model (DEM) and Digital Surface Model (DSM) , Preparation of topographic survey plans with 10 centimetre contour interval featuring bridges, drainage structures, intersections, buildings, and vegetation

Project Completion:

Field Work: 1 days

Data Processing: 2 days

Challenges: Hilly Terrain

Dr. Qaisar Ali Associates

Drone Survey for Science & Technology Museum

Client:  Dr. Qaisar Ali Associates

Method: LiDAR Scanning

Deliverables: Preparation of Digital Elevation Model (DEM) and Digital Surface Model (DSM) , Preparation of topographic survey plans

Project Completion:

Field Work: 1 days

Data Processing: 1 days

Challenges: Dense Vegetation

Khyber Pakhtunkhwa Integrated Tourism Development Project - KITE

Drone Survey for 3D Modelling of Takht Bhai and Jamal Garhi Ruins

Client:  Khyber Pakhtunkhwa Integrated Tourism Development Project – KITE

Method: Photogrammetry

Deliverables: 3D Modal for VR and Orthomosaic

Project Completion:

Field Work: 1 days

Data Processing: 2 days

Challenges: Hilly Terrain

Khyber Pakhtunkhwa Integrated Tourism Development Project - KITE

Drone Survey for the Slope Stability analysis in Kaghan, Pakistan

Client:  Khyber Pakhtunkhwa Integrated Tourism Development Project – KITE

Method: Photogrammetry

Deliverables: Point cloud data

Project Completion:

Field Work: 1 days

Data Processing: 1 days

Challenges: Hilly Terrain

Military College of Engineering Risalpur

Drone Survey of Iron Ore in Baluchistan for the Geophysical analysis

Client:  Military College of Engineering Risalpur

Method: Photogrammetry

Deliverables: Digital Elevation Model, Point Cloud data

Project Completion:

Field Work: 1 days

Data Processing: 1 days

Challenges: Hilly Terrain

National Institute of Urban Infrastructure Planning (NIUIP)

Drone Survey of flood affected areas of Swat

Client:  National Institute of Urban Infrastructure Planning (NIUIP)

Method: Photogrammetry

Deliverables: Digital Elevation Model, Contours, Point Cloud data and Orthomosaic

Project Completion:

Field Work: 3 days

Data Processing: 2 days

Challenges: Hilly Terrain

Provisional disaster management Authority (PDMA)

Drone Survey of River Kabul for the analysis of flood

Client: Provisional disaster management Authority (PDMA)

Method: LiDAR Scanning

Deliverables: 3D Model, Flood Analysis Data, Orthomosaic and Point cloud data.

Project Completion:

Field Work: 1 days

Data Processing: 5 days

Challenges: River

Design and Supervision Projects

US-AiD Funded Fata Infrastructur Program

400M USD project 

  • 200 Schools in Fata Area, new designs, fit outs, re-construction
  • 2 Hospitals, each 150 beds
  • 147 km of Roads
  • 3 pre-stressed girder bridges
  • 75 Drinking water supply Schemes
  • 75 Irrigation water supply schemes
  • 150 solar tube-wells for water Supply Schemes
Pakhtunkhwa Highway Authority

Structural Retrofitting of Existing Bridges

Performing Non-Destructive testing on Superstructures of 12 Bridges, Pre-stressed and simply-supported. creating structural models in SAP2000

Steel Structures
  • Steel Building in Al-Kharaj for Furniture Factors
  • vetting and verification of Calculations for Steel facatory in Neom Area
  • Modification of Gathering Hall in Georgia, USA
Structural and Architectural designing of apartment blocks

8 Storey double basement Structural and Architectural services, including geotechnical studies

Hospital Projects
  • Liaquat Memorial Hospital
  • HAsanZai Hospital
  • 150 Bed General Hospital, Hota, Sudhere
  • Al-Ankies 50 Bed Hospital, Najran
  • Ministry of Municipal and Rural Affairs Alghath
  • Bank ul Tasleef, Al Malaz
Oxford University Press Building, Interior Design
Building Information Modelling

Drone Survey of flood affected areas of Swat

Client:  National Institute of Urban Infrastructure Planning (NIUIP)

Method: Photogrammetry

Deliverables: Digital Elevation Model, Contours, Point Cloud data and Orthomosaic

Project Completion:

Field Work: 3 days

Data Processing: 2 days

Challenges: Hilly Terrain

Integration of GIS and BIM

Integration of 19 BIM models, created in Revit to ArcGIS for a Red Sea Global Project

Amusement Park at Defense Housing Authority

Design of Amusement Parts, design of Associated Steel structures, Geotechnical studies, Drone based Mapping 

Dr. Qaisar Ali Associates

Geotechnical and Drone Services on Need Bases across KPK